Northern Ave. Street Project Bid

The Village of Barryton is accepting bids for the Northern Ave street project

Northern Ave from M66 to Hudnut Street approximately 62’x1410′

Project includes: Crush existing asphalt and shape to create a 3%-4% slope (Approx 10,500 syd); furnish and install 2″ thick leveling asphalt using 13A HMA material (approx 1,155 ton); furnish and install 1.5″ thick surface asphalt using 5E1 HMA material (approx 870 ton); adjustment of 3 manhole frames; install pavement markings per existing layout (approx 2,128 ft); plus any other miscellaneous work items typically required for said work.

Project must be completed in 2024.  Lump sum estimates will not be accepted, must be in bid tab form.  Bids must be received by March 15, 2024 to be considered.  Any other questions can be directed to the Village of Barryton office – Courtney (989)382-7822, barrytongov@gmail.com